Description |
Component Location ...
Inspection 1. Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals. 2. Inspect the voltage value whether it is sufficient to be regular value or not. Voltage ...
Description Canister Close Valve (CCV) is installed on the canister ventilation line. It seals evaporative emission control system by shutting the canister from the atmosphere when leakage detecting system operates. ...
Inspection • Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage. Power Circuit Inspection 1. Disconnect the Inhibitor switch connector (A). 2. Ignition KEY "ON" & Engine "OFF". 3. Measure voltage between supplied ...