Description |
Component Location ...
Inspection 1. Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals. 2. Inspect the voltage value whether it is sufficient to be regular value or not. Voltage ...
Inspection 1. Turn the ignition switch OFF. 2. Disconnect the ECTS connector. 3. Remove the ECTS. 4. After immersing the thermistor of the sensor into engine coolant, measure resistance between the ECTS terminals 3 and 4. 5. Check that the resistance is within the specification. TemperatureResistance ...
Components 1. Shift lever assembly 2. Shift cable retainer3. Shift cable assembly4. "P" position switch5. Manual mode switch housing6. Shift lock solenoid ...