Removal |
1. |
Disconnect the vapor hose (A). |
2. |
Remove the PCV valve (B). |
Inspection |
1. |
Insert a thin stick (A) into the PCV valve (B) from the threaded side to check that the plunger movement.
|
Installation |
1. |
Install in the reverse order of removal.
|
Operation Principle ...
Inspection TCM Problem Inspection Procedure 1. TEST TCM GROUND CIRCUIT: Measure resistance between TCM and chassis ground using the backside of TCM harness connector as TCM side check point. If the problem is found, repair it. Specification: Below 1? 2. Test TCM Connector: Disconnect the TCM connector ...
Description The used radar frequency of BSD is two, "North America region" and "Except North America region". If it replaces BSD unit, BSD unit has to perform the procedure of variant coding. BSD Variant Coding 1. Select the "BSD Variant Coding" procedure in BSD system. 2. Perform the "BSD Variant Coding" ...