Special Service Tools |
Tool Name / Number | Illustration | Description |
RKE Battery Checker 09954-2P100 | Measuring the RKE battery voltage |
Personal Protective Equipment |
Name | Illustration | Description |
Insulation glove | Used when inspecting or working on the high voltage components [Insulation performance : 1000V / 300A or above] | |
Insulation shoes | Used when inspecting or working on the high voltage components | |
Insulation clothes | ||
Insulation helmet | ||
Safety glasses | Used in the case below • During Removal & installation or inspection of the high voltage battery terminals or wiring, which spark might happen. • During working on the high voltage battery pack assembly. | |
Face shield | ||
Insulation mat | Putting the removed high voltage components on the insulation mat to prevent safety accidents. | |
Insulation sheet | Covering
the high voltage components with insulation sheet to prevent people who
don’t wear the personal protective equipment from safety accidents. |
General Troubleshooting Information Before Troubleshooting 1. Check applicable fuses in the appropriate fuse/relay box. 2. Check the battery for damage, state of charge, and clean and tight connections. ...
...
Removal • Removal of the airbag must be performed according to the precautions/ procedures described previously. • Before disconnecting the front impact sensor connector, disconnect the front airbag connector(s). • Do not turn the ignition switch ON and do not connect the battery ...
Description Purge Control Solenoid Valve (PCSV) is installed on the surge tank and controls the passage between the canister and the intake manifold. It is a solenoid valve and is open when the ECM grounds the valve control line. When the passage is open (PCSV ON), fuel vapor stored in the canister is ...